CFB Vortex Finder,Boiler Spare Vortex Finder,Cyclone Separator in Boiler Jinan Yuanda Power Equipment Co.,Ltd. , https://www.ydboilerpart.com
C Shape Purlin Roll Forming Machine
Our Advantages                                     Â
Easy operate & Safe                                  Â
Introduced Mitsubishi PLC with touch screen. Friendly man-machine interaction.
The system is simple to learn and easy to operate.
The final product can be cut as per set length in PLC controller, and the length is automatically measured by encoder. When final product reaches the set length, machine will stop to cut the product automatically. Finish this action, machine will run again continuously.Â
Data
Technical parameters
Item
Specification
Â
Raw MaterialType
galvanized coils
Thickness(mm)
1.5-3.0
Yield strength(mpa)
235-345
Roller material
Cr12 mould steel
Hardness of rollersÂ
HRC58-60
Shaft for rollersÂ
Solid shaft with 82mm,processed with cylindrical grinder
Forming speed(m/min)
About 10-15
Speed adjusting mode
Misubishi frequency transformer
Roller drive                                              Â
Decelerating motor + Chain drive
Cutting mode
Hydraulic cutting
Cutter materialÂ
Cr12 mould steel
Length measurement
Nemicon Encoder
Control mode
Mitsubishi PLC
Operating mode
Button + Mitsubishi Touch screen
Main motor power(kw)
About15KW
Total power(kw)
About 20.5KW
Process flow
Decoiler -- Feeding & Guiding -- Roll forming---Hydraulic Cutting - product to run out table
Components of machine
Decoiler (manual decoiler and hydraulic decoiler for option)
1setÂ
Feeding & guiding device
1set
Main roll forming machine
1set
Hydraulic cutting system
1set
Mitsubishi Controlling system
1set
Run out table
1set Â
Our Certificate                                       Â
FAQ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
Q1:When your factory extablished?Â
A1:Â We extablished since 2003, team with engineers who have 20 years experience in metal forming machine industry. We produce machine all-in-house, from raw material to ready machine, all done in our factory, so that we can control our machine quality and delivery time.Â
Q2:How long does it take to deliver the machine after the order & deposit?
A2:Usually it will take 50-60 working days to manufacture the machine and make it ready to deliver. At first 15 days the technical drawing will be made. The second 25 days start manufacturing the parts and ready to assemble. In the last 20 days the machine will be assembled and inspected to make sure it is ready to deliver.
Q3:What is your warranty term?
A3:Machine warranty time is 12 months. We supply life time service for our produced machines for all customers.Â
Q4:Can you offer oversea service?
A4:Yes,we have experienced technicians who can be sent to different countries to install our machines and supply others service .
Â
The top region of the cyclone (called the vortex finder) where the combustion gases first impinge is exposed to temperatures averaging about 870°C. In addition to high temperature, the vortex finder is exposed to corrosion from acids, chlorides, sulfates, and other chemicals plus erosion from unburned refuse and sand.