Diesel pump installation of the five precautions and the use of norms: We use the ZYB diesel pump must be developed when strict technical maintenance specifications, the fuel filter work 100 hours, the fuel tank 500 hours of cleaning time, Park Taibang if the filter failure damage should be promptly replaced, shall not be removed and Using DC-type fuel supply. Even working under normal working conditions for 500 hours should be disassembled once. In the demolition inspection to ensure that places, hands, tools and cleaning oil clean, so as not to be contaminated by even objects. During disassembly, please do not chaos, play chaos, do not mess up when cleaning, do not wash basin with other non-even pieces, so as to avoid bumps and bruises. Do not change the assembly position at assembly to achieve some of the objectives of the machine does not meet the requirements of the work. When the oil valve seat and the oil tight cap are installed, it shall be tightened according to the specified torque to ensure the good technical condition of the assembled fuel injector and fuel injection pump. Understand the structural features and working principle of the coupled parts, strengthen and improve the maintenance of dual parts, operation, trouble-free do not arbitrarily adjust, do not disassemble and maintain the use of maintenance, maintenance, chaos, chaos, cleaning maintenance Do not chaos chaos touch, the assembly does not change when chaos twist regulation, all according to the specification of technical requirements, in order to achieve the purpose of extending its service life. 1, the installation should pay attention to the arrow on the valve body should be consistent with the media flow. Do not install in places with direct dripping or splashing water. Install vertically upwards. 2, diesel pump should ensure that the supply voltage is within the range of 15% -10% of the rated voltage fluctuations within the normal work. 3, ZYB diesel pump installed, the pipeline should not have reverse pressure. And need to power several times to make it suitable for temperature before formally put into use. 4, ZYB diesel pump should be thoroughly cleaned before installation of the pipeline. Access to the media should be free of impurities. Pre-filter valve. 5, when the ZYB diesel pump failure or cleaning, in order to ensure the continued operation of the system, the bypass device should be installed.
Gasket plate heat exchanger is made of many stamped corrugated sheets at a certain interval, sealed around by gaskets, and superimposed by the frame and compression spiral. The four corner holes of the plate and gasket form a fluid distribution tube and a collection tube, and at the same time reasonably separate the hot and cold fluids, so that they flow in the flow channel on both sides of each plate, and carry out heat exchange through the plate.
A gasketed plate heat exchanger is a type of heat exchanger that consists of a series of corrugated metal plates sealed together with gaskets. The plates are typically made of stainless steel or other materials with good heat transfer properties. The gaskets, usually made of elastomer or other compatible materials, create a seal between the plates and ensure that the fluids remain separate.
Benefits
Features Gasketed Heat Exchanger,Gasket Plate Heat Exchanger,Frame And Plate Heat Exchanger Jiangsu Baode Heat-Exchanger Equipment Co.,LTD , https://www.baodeexchanger.com
•High energy efficiency – low operating cost
•Flexible configuration – heat transfer area can be modified
•Easy to install – compact design
•High serviceability – easy to open for inspection and cleaning and easy to clean by CIP
•Gaskets and Sealing
•Counter-Current Flow
•Flexibility and Modularity
•Easy Maintenance and Cleaning
ã€Print】 ã€Close】