There are many types of mine surveying and mapping, which are roughly as follows: First, the basic mine survey map open air: (1) Basic terrain of the mining area, 1:500~1:2000; (2) Floor plan of stripping and stripping project: 1:200~1:1000. underground: (1) Basic topographic map of the mining area: 1:500~1:2000; (2) Plan of horizontal roadway plan or layered mining plan, 1:500~1:1000. Second, the special map open air: (1) General map of the mining area, 1:2000~1:5000; (2) Plane and elevation control and topographic framing map of the mining area; (3) Comprehensive plan of mining and stripping project, 1:500~1:2000; (4) Floor plan of the open pit mining industry site, 1:500~1:1000; (5) Plan and section view of the blasting project, 1:200~1:1000; (6) Floor plan of dumping site and drainage roadway, 1:1000~1:2000; (7) Plane and section view of the slope movement; (8) Profiles and plans for the calculation of reserves and losses and depletion, 1:1000~1:2000; (Ix) the main transport railway track plan or profile view, 1:2000 ~ 1000; Downhole: (1) General map of the mining area, 1:100~1:5000; (2) Plane and elevation control and topographic framing map of the mining area; (3) Uphole and down comparison maps, 1:500~1:1000; (4) Plan of industrial site, 1:500~1:1000; (5) plan of mining and cutting engineering and plan sectional view of stope, 1:200~1:500; (6) Floor plan of the bottom hole, 1:200~1:500; (7) vertical section of the wellbore, vertical ratio 1:200 ~ 1:500; horizontal ratio: 1:20 ~ 1:50; (8) Longitudinal sectional view of the main transport roadway, with a horizontal ratio of 1:500 to 1:1000 and a vertical ratio of 1:50 to 1:100; (9) Vertical projection drawing of the steeply inclined ore body mining project, 1:500~1:1000; (10) Stereo view of the well lane, 1:1000~1:2000; (11) Three-level ore calculation and loss-depleted calculation chart. FlagKing Flags Manufacturing Co.,Limited , https://www.dgcnflagking.com