Dear
Customer:
Thanks for using the turntable shell-making
manipulator by our company, please give feedback or suggestions in time after
use, we will be very grateful for your support. Before using this robot, please
read the following carefully, which will be of great help to device problems in
the future.
1. The voltage used by this equipment
must meet the national grid power supply standard.
2. The compressed air pressure range
used by this equipment: ≧0.5-0.7MPa.
3. The operator must read this manual
carefully before use, and operate in strict accordance with the operating
procedures.
"Maintenance is more important than repair, and repair is more
important than purchase." Correct use and maintenance are necessary
guarantees to extend the life of this equipment.
At the same time, please read this manual
carefully before installation and use. Strictly follow the requirements of the
manual for installation, use and maintenance to avoid accidents and unnecessary
economic losses due to operating errors.
3 Axis Robot,Car Accessories Robot,Motor Parts Robot,Agricultural Tool Robot Dongying Dosun Mechanical Automation Co.,LTD , https://www.dosunmachinery.com
At 9 o'clock on the morning of August 4th, the 20th escort formation of the Chinese Navy demobilized from a military port in Sanya and went to the Gulf of Aden and the Somali waters to carry out escort missions. Guo Zhongmin, a staff member of the Dalian Marine Diesel Assembly Workshop, was selected for the technical support of a supply ship for the escort formation.
It is reported that this is the second time that Guo Zhongmin has been invited to provide power technical support for a supply ship of the naval escort formation. In July of this year, Dalian Shipai received an emergency from a certain department of the Navy. Due to frequent failures of a supply ship, a domestic machine manufacturer responsible for maintenance has been helpless. Two employees, Peng Kai and Guo Zhongmin, were invited to a military port to investigate the cause of the failure. To guide the mainframe repair work. After Peng Kai and Guo Zhongmin ushered in a supply ship, after a series of investigations and maintenance work, the host failure was eliminated. In order to ensure the smooth completion of the escort mission, the Navy also specially invited Guo Zhongmin to set off with the escort formation officers and soldiers to provide technical support for a supply ship.
Guo Zhongmin is the squad leader of the final assembly of the Dalian Shipyard assembly shop. Since joining the work in 1978, he has always adhered to the first line of production, starting from a common assembly fitter. With earnestness and perseverance, coupled with the accumulation of water-dropping stone, he has gradually grown into a diesel engine assembly and maintenance expert, and has undertaken many important models. As for the assembly work, the company has successfully completed the after-sales service of the company. He has successively won many honorary titles such as “Model Workersâ€, “Top Ten Models†and “Outstanding Party Membersâ€.