Plastic Recycling Machine converting waste plastic to be plastic oil, machine main parts as below:
Pyrolysis reactor, Oil Separator, buffer Tank, cooling system,water sealing... Different parts working as different function, but key target is safety and profit.
Yilong Machinery ensure squeeze all of the oil covered in customer material to ensure customer profit, of cause, based on safe working condition.
Waste Plastic Recycling Machine Plastic Waste Recycling Machine,Waste Plastic Recycling Equipment,Waste Plastic Recycling Plant,Automatic Waste Plastic Recycling Machine Shangqiu Zhongming Eco-Friendly Equipment Co., Ltd. , https://www.sqzhongminggroup.com
The complaint from Mr. Wang of Heilongjiang Acheng City stated that he purchased a FAW Jiefang J6 flat-head diesel semi-trailer traction car at Harbin FAW Senhua 4S shop, and failed to work normally for less than two weeks. The service station was inspected. Identified as a natural engine failure.
On April 19, 2010, Mr. Wang of Acheng City happily arrived at Harbin FAW Senhua 4S shop and bought his “strong labor force†FAW Jiefang J6 heavy truck new car. After 24 sunsets, he started driving a new car. His transportation life.
In the early hours of May 2, when Mr. Wang drove his car and walked to Yanwuji Village in the section of Yilan County to Boli County, he found that the indicator light of water shortage in the water tank was on, but the water temperature was normal, and he got off the bus and checked The engine was found to be blue smoke and did not dare to continue driving. At 13:00 on the 3rd, rescue workers rushed to start repairs. After inspection, the engine of the Jiefang J6 tractor was abnormal. After dismantling, it was discovered that the engine 6th cylinder was full of antifreeze fluid, and that organic oil was also present in the tank. After draining the antifreeze fluid, it was found that there was an approximately 15 cm in the cylinder of the 6th cylinder of the engine. Long cracks, identified by maintenance technicians as the engine 6th barrel burst is a problem at the factory, the engine needs to be replaced. Rescuers let Mr. Wang pay more than 3,000 yuan to the Qitaihe service station at his own expense, waiting for the replacement of the engine.
As of press time, the service department of FAW Heavy Truck has not yet replaced Mr. Wang with a new engine. Mr. Wang has been waiting in Qitaihe City for his new car problem to be solved. This site will also pay more attention to the development of this incident.