Recently, the small blue petrol engine of Jiangling’s engine plant has met the national five-star on-site review. The gasoline engine assembly production line that participated in this review is a flexible production line that is jointly developed by the Ford 2.0LGTDI engine and Jiangling independently developed 1.5L and 1.8L engines. During the assembly process, new process technologies such as on-line testing and cold testing were used to ensure that engine problems were discovered and resolved in a timely manner. Zero-defect products “do not accept, do not manufacture, and do not pass” defective products. Gasoline engine assembly line management adopts Ford Motor Company's latest GFPS production and operation system to manage, through the establishment of a consistent and competent organization (ACO), according to SQDCPME seven functional operating system (OS) management assembly line daily operation, at the same time with the introduction of policies, time data Management, visual management, standardization operations, process validation, continuous improvement of the six key consistency processes (KUP) interspersed with the implementation of the seven major operating systems for scientific, systematic, and advanced management.
National five-star on-site review

National five-star on-site review

After listening to the report of the director of Xu Yingge, the review experts immediately entered the site to conduct a one-on-one review of the process, quality, equipment, and on-site management innovation of the assembly line. During the on-site audit, the experts observed carefully. Asked in detail about the daily management of field engineers in our production, affirmed our existing on-site management methods, applied to our production process ETS system, QWX system, simulation, process planning, design, logistics design, bottleneck management, after-sales service Failure management systems and other management methods provide a high degree of appreciation, combined with on-site actual conditions to provide on-site lean improvement, optimize jobs; further in-depth analysis of equipment failure information, reduce equipment failure; site data electronic information sharing recommendations.

Excavator Components

This classification mainly includes the aluminum die casting Machinery Parts using in Excavator Components area.
From the part, we can easily find that the parts have a lot of features of big cavities, so the part will have big potential risk of mold release problem, if so, the part may happen to be deform, sticking to the mold etc, especially when the part sticking to the mold, if no clear in time, while next shot, the mold may be destroyed while clamping.
Normal raw material: ADC12,A380,YL102
Process Technology: Low-pressure casting,Shot Blasting,NC Machining,Spray Coating
Product Dimensions: Customized
Casting General Tolerance: Grade GBT6414-CT8
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Machinery Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Die Casting Excavator Parts,Die Casting Excavator Components,Al Die Casting Excavator Components

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.bolangautoparts.com