Technical indicators: When using non-high pressure nuclear phase meter should pay attention to what matters? Ceramic Tower Packing,Packing Material In Distillation Column,Intalox Saddles Packing,Ceramic Intalox Saddle Ningbo Cijie Chemical Equipment Co., Ltd. , https://www.chemicaltower.com
1 Accuracy: In-phase error ≤ 15°, different phase error ≤ 15°
2 sampling rate 3 times/second 3X and Y collector power supply voltage 7.5V ±1.5V
4X and Y collector operating current ≤4mA
5 The line-of-sight distance between host and X and Y collectors is X, Y ≥ 100m
6 working environment: -35°┉ +50° Humidity: ≤95%RH
7 Storage Environment: -40° ┉ +55° Humidity: ≤95%RH
8 The voltage level measured by the host of this product is 0.38KV┉500KV
When the live conductors are touched, acoustic signals can be heard and 4 indicators are on. After 5-10 seconds, LED2-4 will be off and the transmitter will stop automatically. The working time set for the voltage measurement is 5-10 seconds later. Enter the phase measurement, at this time only one LED indicator light, if the sound and light signals are not stopped after 5-10 seconds, the battery power is insufficient to change the battery. If you want to measure the other phase of the line, you need to take the transmitter off the line until the LED1 goes out and put the transmitter on the line to do another voltage measurement. Ibid.
When entering the measurement mode, the transmitter transmits radio frequency signals to the air while a part of the signal is transmitted along the line as an antenna. Once the receiver can recognize the signal, the receiver immediately starts operation.
The wireless phase detector is a special device used for checking the phase sequence of large-scale equipment such as high-voltage power lines and transformers before installation and operation. The PSWHX wireless high-voltage nuclear phase meter has changed the past contact-type measurement method, eradicating the danger of contact-type measurement, which has ensured the personal safety of the measurement personnel. The measurement method is simple and the measurement results are reliable.
1. During on-site testing, the operator should operate according to the high-voltage test safety distance standard of the power department.
2. The tested insulating rod voltage level is ≤ 220KV.