It is reported that a few days ago, Nantong Pacific Ocean Engineering Co., Ltd. (SOE) another LNG regasification module M020 officially started construction. The attendance ceremony was attended by the owners Wartsila, DNV GL classification society, and relevant personnel of the SOE Offshore Engineering Department.

It is understood that prior to this, eight of these types of modules that SOE has delivered have been successfully installed and operated on the Floating Storage Regasification Unit (FSRU). The ninth module was also started in early April and is expected to be completed by the end of this year. Delivered to the owner early next year.
 
According to the news, in recent years, the continued downturn in the international economic situation has had a great impact on the offshore shipbuilding industry. Since joining CIMC Enric in September last year, SOE has fully utilized its advantages in technology, quality, construction and management. , successfully delivered a number of LNG ships and a number of offshore modules, and strive to prove its strength to the industry.

According to reports, the module built this time is the tenth LNG regasification module built by Wartsila and SOE. Wartsila has negotiated with SOE on the construction of several regasification modules.

Rubber Injection Molding Machine

Vertical Rubber Injection Molding Machine,Horizontal Rubber Injection Molding Machin,Rubber Injection Molding Machine,Single Stations Rubber Molding Machine

Dongguan Pont Neuf United Composites Technology Co. Ltd. , https://www.xinqiaolian.com

Posted on