By the end of 2012, Hangzhou will complete the construction of 87 power stations.

Statistics from the Hangzhou Economic and Information Commission show that there are 1,497 new energy vehicles in Hangzhou, including 871 hybrid vehicles and 626 pure electric vehicles. These models, in addition to applications in the public transport, rental, electricity, postal, express delivery and other fields, some have entered the homes of ordinary people - Hangzhou New Energy Vehicle has more than 200 private users, of which 100 people bought a car, and another 100 people are renting a car.

In the face of the oil tiger that can't afford it, if you are also a little tempted by the new energy car, go to the Peace International Convention and Exhibition Center on August 10th to 12th. The 2012 China (Hangzhou) New Energy Automobile Industry Exhibition and the 2nd China Hangzhou New Energy Automobile Exhibition will be held here, with more than 800 booths, ranging from complete vehicles to batteries. Bus companies such as Yutong, Zhongtong, Jinlong and CSR have brought the latest new energy buses.

When you go shopping, you can get what you need - the first floor of the Peace Exhibition Center, mainly the new energy passenger car and the grid charging and replacing infrastructure; the second floor is mainly the battery and parts, as well as the negotiation area and test drive test drive In the district, on the Peace Square, there are 180 bus booths.

Perhaps everyone has more concerns about buying new energy, especially pure electric vehicles: it is inconvenient. After all, if you go home to charge, you have to have power next to the parking space. And to change the battery, you have to go to a special charging and replacement station, such a site is not a lot of Hangzhou. In this regard, the relevant departments said that Hangzhou is paying close attention to the construction work of the power station. At present, 62 power plants have been built in Hangzhou, and 12 power stations have been put into use. By the end of this year, the construction of 87 power stations will be completed. In addition, the relevant departments also require relevant manufacturers to set up maintenance points in Hangzhou to ensure that when new energy vehicle users encounter problems or failures, they will be on site for repair within 2 hours.

Ceramic Tower Packing

Ceramic Tower Packing,Packing Material In Distillation Column,Intalox Saddles Packing,Ceramic Intalox Saddle

Ningbo Cijie Chemical Equipment Co., Ltd. , https://www.zjchemicaltower.com

Posted on