Commercial production began in April 2006. Mine underground mining tunnels manner, flotation and reselection method for recovering gold. Rice Like production capacity: processing ore amount of 1,130 tons / day. The initial daily processing of ore is 900 tons, mainly dealing with low grade ore piled on the surface and tunnel. When the ore grade is stable, the planned gold ore recovery rate is 95%. It is estimated that the production of gold in 100,000 ounces in 2008 will reach 75% of the mineral processing capacity. The ore reserves/resources amounted to 2.787 million tons, and the average grade was 8.75 g/ton. San Gold has a 100% stake. (Source: Resource Network)

Mild Steel Exhaust Pipe

Our mandrel bending machine can bend 1.5" to 4" mild steel tube, we can bend from 0 degree to 180 degree. The mild steel pipe can be very competitive as the cost of raw material is very low. We can do high temperature black coating to protect the tube.

High flow Exhaust Pipe

Bolt-on exhaust pipe can use more conveniently



Mild Steel Exhaust Pipe

Mild Steel Exhaust Pipe,4 Inch Exhaust Pipe ,Exhaust Flex Pipe,Mild Steel Material Exhaust Pipe

JINING FAREAST LIANGFEI CONVERTER & MUFFLER CO. LTD , https://www.golbaltour.com

Posted on