(1) Obtaining geological data

The development of mines must have reliable geological data, that is, mineral geological exploration reports (including various drawings, reserves calculations and mineral quality analysis and analysis data) approved by the State Mineral Reserve Approval Agency or the provincial mineral reserve approval authority. Application fee to get exploration results ready for exploitation of mineral resources of the unit or individual shall geology department in charge of mineral submit: â‘  have relevant documents establishment of a mining company's technical capabilities; â‘¡ start-up capital of mining enterprises to prove; â‘¢ paid to obtain exploration results application.

(2) Submit project proposal

Relevant state-owned enterprises, collectives and individuals may, in accordance with the national economic development and domestic and international market demand, submit to the State Council or local competent authorities (generally the planning committees at all levels) specific proposals for the development of mines, including mineral products, mineral reserves, mineral deposits. Occurrence conditions, mine location, reasons for development, who is the main body (state-owned, collective, individual, joint venture), mining methods, production scale, product quality, market forecast, fund raising methods, economic and social benefits of mining and many more. [next]

(3) Application for project approval

According to the variety, scale, investment and operation mode of the proposed minerals, the competent department of the State Council shall conduct an evaluation and review of its project proposal. After approval, determine the main body of the development mine. The detailed feasibility report is submitted by the main body of the mine to the competent authority for examination and approval, and the approval report is reviewed by the examination and approval authority. The contents of the review mainly include: mine area, mine design plan (process, technology, equipment), production technology and economic conditions, safety and environmental protection and fund raising, and so on. After approval, the legal person shall be determined, the mining license shall be processed, the project shall be formally established, the commencement formalities shall be handled, and the preparatory work for the construction shall be carried out.

(4) Construction and construction

Comprehensive design (overall design or preliminary design, construction design). Determine the contracting method, according to the strength of the main body of the mine, implement self-operated or outsourcing, bidding and other forms. In recent years, the state has implemented a project legal person responsibility system, implemented funds and timely put in place to organize construction. In order to ensure the progress of the project and the quality of the construction and to save as much as possible, an inspection and inspection agency should be established. Finally, organize the test acceptance.

(5) Production preparation

In the construction of the construction, there should be various preparations for the production, such as production organization, staffing, post worker training, operating procedures and various rules and regulations, raw materials, spare parts, production funds, etc., in order to build Normal production can be achieved immediately after production.

CAD Design service, we have the technical team of production-orientated manufacturing engineers and technologists specialised in producing Sheet Metal Parts having already prepared drawings and documentation.
The first step of the engineering activity in the offer preparation phase is the manufacturing feasibility study, which, if necessary is completed with engineering proposals and elaborated modifications focusing on the more effective production resulting in cost reduction.

Under the partnership we offer technical support to our customers regarding either new product launch or modification of ongoing products. The quality of our technical documentation perfectly complies with today's requirements bearing in mind the production requirements of the Sheet Metal parts.

Added value for customers represented by our engineers:

proposals for manufacturability

proposals to economically manufacture parts

proposals for cost reductions

Engineer colleagues use the latest CAD programming systems:

Supported softwares: ProE, AutoCAD,etc

Supported file-extensions: .stp, .igs, .dxf, .dwg

Cad Design

Cad Design,Sheet Metal Parts,Large Aluminum Sheet Metal,Production Metal Stamping

QL Sheet Metals Co.,Ltd , http://www.ql-metals.com

Posted on